Dear Daniel,
Just a note to thank you and let you know that the window installation went well at Charter House the YMCA building and your training for the Stronghold system really useful. All concerned, operatives, customer and tenants were all impressed with the method of installation and the use of the Stronghold. The savings on scaffolding was immense due to the staircases being at each end of the building and both 10 floors tall.
I would estimate the savings at £20,000.00 at least and the safety greatly enhanced by using the Stronghold rather than scaffolding.
I will be in touch for training new operatives in the future.
Yours sincerely
Ken Richardson
Director